Kitchen Countertop Installation: Complete Timeline & What to Expect

Last Updated: May 2026 | 8 min read

You've chosen your granite or quartz countertops—now what? Understanding the installation timeline helps you plan your kitchen remodel, coordinate with other contractors, and know exactly when you'll have a functional kitchen again.

After installing over 1,000 countertops across Western Massachusetts since 1990, we've refined our process to be efficient, predictable, and minimally disruptive to your daily life.

Quick Answer: From slab selection to final installation, expect 2-3 weeks for most kitchen countertop projects. This includes templating (1-3 days after deposit), fabrication (5-10 business days), and installation (3-6 hours).

Complete Installation Timeline

Week 1: Selection & Templating

Day 1-2: Showroom Visit & Slab Selection

Day 3-5: Professional Templating

Week 2: Fabrication

Days 6-15: Stone Fabrication

Week 3: Installation & Completion

Installation Day

Phase-by-Phase Breakdown

Phase 1: Slab Selection & Deposit

Visit our Ludlow showroom to see full slabs in person, compare colors and patterns, select your specific slab, choose edge profile, and sign contract with 50% deposit.

What to Bring:

Timeline: 1-2 hours

Ready to Start Your Project?

Visit our showroom to select your slab and begin the process

Schedule Visit Call (413) 583-3399

Phase 2: Templating

Scheduled 1-3 business days after deposit. Takes 1-2 hours. Requires someone home to answer questions.

What Our Team Does:

CRITICAL - Cabinets Must Be:

Phase 3: Fabrication

What Happens in Our Facility:

Timeline: 5-10 business days | No action required from you

Phase 4: Installation Day

Before Installation (Night Before):

Installation Process:

Timeline: 3-6 hours | You need to be home

How to Speed Up Your Installation

1. Have Cabinets Ready

The #1 delay is cabinets not being ready for templating. Coordinate with your cabinet installer to have everything done before we template.

Timeline savings: Eliminates 1-2 week delay

2. Choose In-Stock Materials

Common granite and quartz colors are in stock. Exotic slabs may need to be ordered.

Timeline savings: Eliminates 2-4 week wait for special orders

3. Be Flexible with Scheduling

If you can be flexible on installation day/time, we can fit you in faster.

Timeline savings: 3-7 days

Frequently Asked Questions

Q: Can you rush my installation?

A: Sometimes. Rush jobs may incur additional fees ($300-800) and depend on current schedule. Quality should never be rushed.

Q: What if I'm not ready by installation day?

A: We'll reschedule, but your project goes back into the queue. Could add 1-2 weeks.

Q: Can I use my kitchen during fabrication?

A: If you still have old counters, yes! If not, you'll need temporary solutions.

Q: How long until I can use my new counters?

A: Immediately for most purposes. Wait 24 hours for seam areas to fully cure before heavy use.

Q: Do you work weekends?

A: Installation can be scheduled on Saturdays for an additional fee. Sundays are typically unavailable.

Pre-Installation Checklist

Before Templating:

Before Installation:

Start Your Countertop Project Today

D&C Granite & Marble Design Gallery
664 Center Street, Ludlow, MA 01056

Your Timeline Starts With:

  1. Free consultation (30-60 minutes)
  2. Slab selection + 50% deposit
  3. Templating (1-3 days later)
  4. Fabrication (5-10 days)
  5. Installation (scheduled)
  6. Beautiful new countertops!